Burlington's 3rd Annual "Fines for Food' Campaign Kicks off. Details.
Projects
The DPW Engineering Division provides planning and engineering services for improvements in the public right-of-way. These projects progress from concepts to full construction and may include everything from traffic signs and markings to traffic signals and new streets and sidewalks. These plans and projects allow the transportation system to operate as safely and efficiently as possible for all modes of travel.
CURRENT PROJECTS IN PLANNING, DESIGN, OR CONSTRUCTION
- Great Streets: St. Paul Street and Main Street reconstruction
- Winooski River Bridge Scoping
- Colchester Ave / Riverside Ave / Barrett Street / Mill Street Intersection Scoping
- Winooski Avenue Corridor Study - NEW
- Intervale Road Pedestrian and Bicycle Study - NEW
- Colchester Avenue Sidepath
- Champlain Elementary School Route Improvements
- Shelburne Street Roundabout
- Railyard Enterprise Project
- Champlain Parkway
- Bicycling Improvement Projects
- Union Street Protected Bike Lane
- Lakeview Terrace Neighborhood Greenway
- ONE Neighborhood Greenway
- Riverside Avenue Conflict Markings
- Flynn Avenue Advisory Lane
- Pearl Street Reconfiguration: bike lanes and parking revisions
- Willard Street Bike lane
- Pedestrian Intersection Improvements
- North Avenue Crosswalks
- Colchester Avenue Crosswalks
- Archibald Street and Intervale Avenue (check back soon)
- Main Street and South Champlain Street (check back soon)
- Curb Extensions (check back soon)