At request of the residents of North Champlain Street the DPW with the assistance of the Chittenden County Regional Planning Commission have conducted a speed study at two location along North Champlain Street following the FY15 Paving Program where the speed humps were redeveloped using the 22' Arterial Speed Hump design.
The DPW has reviewed the results of the speed study and offer the following memo with our conclusions as well as the count data that was collected at the two locations.
Memo to DPW Commission, Councilors, and Residents
Location 1 Speed Study Data - Between Monroe Street and North Street
Location 2 Speed Study Data - Between North Street and Manhattan Drive